Comparison Chart for Temporary Poly-pipe and Fixed pipe
Pipe Comparison |
Armin Poly-pipe |
Aluminum |
Pipe size, unit length |
12-inch, 10 mil., 1320/ft. roll |
12-inch, pressure rated, 40/ft. lengths |
Conveyance/gated pipe |
19,000-ft/7,000-ft; 21 rolls |
675 sections |
Weight |
200-lb./roll=4,200-lbs. total |
200-lb./section=135,000-lbs. total |
Predicted service |
one irrigation season |
10-15 years |
Installation design |
none; annual change easy |
engineering study; $3,000. |
Type of installation |
unroll and lay in earth ditch |
excavate and place on pad above ground |
Installation equipment |
truck; 1 helper |
truck, backhoe, dozer, 2+ helpers |
Maintenance |
repair with knife & rubber cord |
675 gaskets seals every 5 yr=$2,000. |
Sediment removal/Cost |
cut, dry, remove, discard/$0.00 |
remove, clean 675 sectionsX$3.=$2,000. |
Frequency of removal |
annually; flow 100%; 0 friction |
5-yr; flows reduced 10%/yr; friction loss |
Affect on earth ditch |
none; remove pipe and use |
destroyed; remove pipe and reconstruct |
Action/Cost to remove pipe |
cut, dry, remove, discard/$ 0.00 |
reverse of installation/$3.-ft.=$81,000. |
Cost to restore |
earth ditch none |
$5.-ft.=$135,000. |
Nature of installation |
temporary |
permanent |
Responsibility to maintain |
no; remove without damage |
yes; remove with cost to restore |
Flexibility of use |
change size=max. flow; low cost |
none without additional costs |
Convey to gated/visa versa |
punch holes/seal holes |
no/close gates |
Turn-out box |
attach in/out with bungee cord |
special coupling for in/out/$50. each |
Turn-out location |
anywhere with moveable box |
40-ft distances with moveable box |
Initial cost, design, install |
21-rollsX$334.=$7014. (.25/ft.) |
675-sec.X$400.=$273,000. ($10./ft.) |
5-yr + maintenance |
$7014.X5=$35,070. |
$277,000. (gaskets & cleaning) |
10-yr + maintenance |
$70,140.00 |
$281,000. (gaskets/cleaning X 2) |
20-yr + maintenance |
$140,280.00 |
$289,000. (exceeds life expectancy) |
40-yr.+ maintenance |
$280,500. (not inflation adj.) |
$289,000. + $273,000. (reinstall) |
Avg. cost for 5 users |
$1,400. (realistic cost) |
$54,600. (unrealistic cost) |
Summary of advantages |
low cost, low maintenance, easy size |
one time installation with 10-15 yr life, |
change results in lower cost, no |
above ground (compared to buried PIP), |
|
damage to ditch, no sediment |
turn-out valves easily moved |
|
buildup, turn-outs easy to make |
||
Summary of disadvantages |
remove in Fall, install in Spring, |
high cost to purchase, install, replace, |
annual expense |
maintain, restore ditch, sediment/friction buildup, liability to maintain, costly |
|
valves, hard to clean |
||
Price Information (1-14-00): |
Size Cost/ft. Cost/roll Wt/roll |
|
All sizes 10 mil. thickness |
*5" .10 $132.00 76 lb. |
|
except noted noted by *. Also |
*9" .14 $185.00 104 lb. |
|
available in 15 mil. thickness. |
10" .20 $265.00 150 lb. |
|
Plugs & gates available. |
12" .24 $317.00 200 lb. |
|
Quantity and rancher discounts |
15" .30 $396.00 253 lb. |
|
may apply. All prices subject to |
*18" .36 $475.00 266 lb. |
|
change without notice. |
22" .23 $607.00 370 lb. |